Fred Broadstock Pool

Client: The City of Edmonton
Location:
Edmonton, AB
Delivery Method: Construction Management
Status: Completed January 2011

Project Information:

Jen-Col was engaged by the City of Edmonton to act as Construction Manager for the much-anticipated renovations.  The project was started in the midst of the economic downturn and funding was very tight. Due to a very tight budget and a limited construction season for outdoor work, Jen-Col proposed and planned a phased system of tender packages which allowed the design team to continue with planning and contract documents for the complete project while Jen-Col managed smaller portions. Phased work included: hazardous material abatement, demolition, excavation and building renovation work.

The work included a new competition size 25 m 6-lane outdoor swimming pool and children’s teaching / splash pool complete with spray toys and a zero depth entry. Renovations to the existing pool house and staff facilities included full interior demolition and rebuild, complete with all new mechanical and electrical systems. All concrete forming scopes of work were self-performed.